ADU Permit Fee Calculator in Los Angeles

 Table of Contents
 1. Introduction
2. How Much Does an ADU Permit Cost in Los Angeles?
 3. Benefits of Building a Permitted ADU in Los Angeles
4. FAQ

Introduction

Building an Accessory Dwelling Unit (ADU) in Los Angeles offers homeowners an opportunity to increase property value, generate rental income, and contribute to the city's housing solutions. However, understanding the permit fees involved is crucial for budgeting and planning. This guide provides a detailed breakdown of ADU permit costs in Los Angeles, including a fee calculator, frequently asked questions, and the benefits of constructing a permitted ADU.


How Much Does an ADU Permit Cost in Los Angeles?

The total cost to permit an ADU in Los Angeles varies based on several factors, including size, location, and complexity. Below is an estimated breakdown of typical fees associated with the ADU permitting process:

Fee CategoryEstimated CostNotes
Design & Plans$6,000 – $15,000+Includes architectural, structural, and Title 24 energy compliance plans.
Plan Check Fee$1,300 – $5,000Paid at submission; based on project valuation.
Building Permit Fee$1,000 – $10,000Includes electrical, plumbing, and mechanical permits.
Zoning Permit Fee$0 – $4,000Required for certain projects; may be included in building permit fees.
Impact Fees$0 – $25,000+Applies to ADUs over 750 sq ft; includes sewer, water, and traffic fees.
School Fees$0 – $4,790Charged by LAUSD for ADUs over 500 sq ft; varies by square footage.
Utility Connection Fees$0 – $5,000+Depends on existing infrastructure and connection requirements.
Miscellaneous Fees$500 – $1,500Includes soil reports, arborist reports, and other site-specific studies.

Benefits of Building a Permitted ADU in Los Angeles

Constructing a permitted ADU in Los Angeles offers numerous advantages:

  • Increased Property Value: A legal ADU can significantly enhance your property's market value.

  • Rental Income: Generate steady income by renting out the ADU to tenants.

  • Multigenerational Living: Provide housing for family members, such as aging parents or adult children.

  • Affordable Housing Contribution: Help alleviate the city's housing shortage by adding legal units to the housing stock.

  • Legal Compliance: Avoid potential fines and complications associated with unpermitted structures.


FAQ

Do I need a permit to build an ADU in Los Angeles?

Yes, a permit is required to ensure compliance with city codes and regulations. Permitting also facilitates legal rental and resale of the property.

How long does the ADU permit process take in Los Angeles?

The permitting process typically takes between 6 to 12 weeks, depending on the complexity of the project and the completeness of the submitted plans.

Are there any fee waivers available for ADU permits?

While some fee waivers may be available for affordable housing projects, most standard ADU permits require payment of applicable fees. It's advisable to consult with the Los Angeles Department of Building and Safety for current programs.

Can I build an ADU without connecting to city utilities?

In some cases, such as with Junior ADUs (JADUs), utility connections may not be required. However, most ADUs will need to connect to city utilities, which may incur additional fees.

Are there any incentives for building energy-efficient ADUs?

Yes, there are federal and state incentives available for incorporating energy-efficient features into your ADU, such as solar panels and energy-efficient appliances.