How to Obtain an ADU Permit in Oakland

What Is an ADU?

An Accessory Dwelling Unit (ADU) is a self-contained housing unit located on the same lot as a single-family or multi-family home. It must include a separate entrance, living area, kitchen, and bathroom.


Types of ADUs in Oakland:
  • Detached ADU: Separate structure, often in the backyard

  • Attached ADU: Shares a wall with the main home

  • Garage Conversion ADU: Converts an existing garage into living space

  • Junior ADU (JADU): Up to 500 sq. ft., located within the main home with a small kitchen

📝 How to Apply for an ADU Permit in Oakland – Step-by-Step

Step 1: Determine Your ADU Type

Is it detached? Attached? A conversion? Knowing this impacts the process and fees.

Step 2: Prepare Plans

Use an architect or pre-approved “off-the-shelf” ADU plans provided by the City of Oakland to save time and money.

Step 3: Submit a Zoning Worksheet

Upload your project details to Oakland’s Online Permit Center for Planning/Zoning review.

Step 4: Apply for a Building Permit

Once zoning is approved, submit building permit documents—this includes construction drawings, energy compliance forms, and more.

Step 5: Review and Revisions

City staff will review your application. If revisions are needed, you’ll be notified.

Step 6: Pay Fees & Get Permit

Once approved, pay all fees and receive your permit to begin construction.

📜 Key ADU Regulations in Oakland

Before applying for a permit, understand these important zoning and building rules:

Regulation TypeRule in Oakland
Lot Size MinimumNo minimum required
Maximum ADU SizeDetached: up to 1,200 sq. ft.
JADU Size Limit500 sq. ft. maximum
Setbacks4 ft side and rear for detached ADUs
Height LimitUp to 16 ft (more allowed in some cases)
ParkingNo additional parking required if near transit
Rental RestrictionsShort-term rentals (<30 days) not allowed for ADUs

💰 How Much Does an ADU Permit Cost in Oakland?

Fee TypeEstimated Cost Range
Zoning/Planning Review$300 – $1,200
Building Permit$1,000 – $5,000+
Plan Check Fees$500 – $2,000
School Impact Fees$0 – $4,000 (waived for ADUs ≤ 750 sq. ft.)
Sewer/Water Connections$0 – $5,000
Total Estimated Fees$3,000 – $12,000+

✅ Benefits of Building a Permitted ADU

  • 💵 Legal rental income
  • 🏠 Increased property value
  • 🚫 Avoid fines for unpermitted construction
  • 🔧 Access to rebates and financing (like CalHFA ADU grants)
  • 🏘️ Long-term housing flexibility

FAQ

Do I need a permit to build an ADU in Oakland?

Yes, all ADU types in Oakland require Planning/Zoning and Building Permits before construction begins.

How long does it take to get an ADU permit in Oakland?

Typically 6–8 weeks, depending on plan completeness and City review times.

Can I convert my garage into an ADU in Oakland?

Yes! Garage conversions are permitted and often cheaper since the structure already exists. Setbacks may not apply.

Do I need to provide parking for my ADU?

No, if your ADU is within ½ mile of public transit, parking requirements are waived.

Are there grants or financing options available?

Yes, you may qualify for CalHFA’s ADU Grant Program (up to $40,000) for pre-development costs and construction loans.