ADU Permit Application in Roseville, California

 Table of Contents
 1. What Is an Accessory Dwelling Unit (ADU)?
2. Key ADU Regulations in Roseville, CA
 3. Steps to Obtain an ADU Permit in Roseville
4. How Much Does an ADU Permit Cost in Roseville?
 5. Benefits of Building a Permitted ADU in Roseville
6. FAQ

What Is an Accessory Dwelling Unit (ADU)?

An Accessory Dwelling Unit (ADU) is a secondary housing unit located on the same lot as a primary residence. ADUs come in various forms, including detached units, attached units, conversions of existing spaces (like garages), and Junior ADUs (JADUs) that are smaller units within the primary dwelling. To legally construct an ADU, homeowners typically need to obtain an ADU permit from their local planning or building department. This permit ensures compliance with zoning laws, building codes, and safety standards, and may involve submitting detailed plans and undergoing inspections.


Key ADU Regulations in Roseville, CA

Roseville's ADU regulations are designed to align with state laws while addressing local needs. Key considerations include:

  • Size Limits: Detached ADUs can be up to 1,200 sq ft; JADUs are limited to 500 sq ft.

  • Setbacks: Typically, a 4-foot setback from side and rear property lines is required.

  • Height Restrictions: ADUs must not exceed 16 feet in height.

  • Parking Requirements: Parking may be waived if the ADU is within 0.5 miles of public transit.

  • Architectural Compatibility: Materials, colors, and roof slopes must match the primary dwelling to maintain neighborhood character.

  • Fire Safety: Compliance with fire safety measures, including defensible space and non-combustible materials, is mandatory.

  • Energy Efficiency: ADUs must meet California Energy Code standards, including solar panel installation and proper insulation.

  • Utility Connections: Separate utility meters are often required for accurate billing and conservation efforts.


Steps to Obtain an ADU Permit in Roseville

  1. Determine Eligibility: Ensure your property complies with zoning laws and is suitable for an ADU.

  2. Select an ADU Type: Decide between a detached, attached, conversion, or JADU based on your needs and property layout.

  3. Choose a Design: Utilize preapproved ADU plans available through the City of Roseville to expedite the approval process.

  4. Prepare Application: Gather necessary documents, including site plans, floor plans, and proof of property ownership.

  5. Submit Application: Apply online through the City of Roseville's Online Permit Center.

  6. Plan Review: The city will review your application for compliance with building codes and regulations.

  7. Permit Issuance: Upon approval, obtain your building permit to commence construction.



How Much Does an ADU Permit Cost in Roseville?

ItemEstimated Cost
Permit Application Fee$200 - $500
Plan Review Fee$300 - $600
Building Permit Fee$1,000 - $2,000
Impact FeesVaries based on size and location
Utility Connection FeesVaries

Benefits of Building a Permitted ADU in Roseville

  • Additional Income: Renting out your ADU can provide a steady income stream.

  • Increased Property Value: A well-constructed ADU can significantly boost your property's market value.

  • Housing Flexibility: ADUs offer housing solutions for family members, guests, or tenants.

  • Sustainable Living: Incorporate energy-efficient designs and renewable energy sources.

  • Compliance with Local Laws: Building a permitted ADU ensures adherence to local zoning and safety regulations.

FAQ

What is the maximum size for an ADU in Roseville?

A detached ADU can be up to 1,200 sq ft, while a JADU is limited to 500 sq ft.

Are there parking requirements for ADUs in Roseville?

Parking may be waived if the ADU is within 0.5 miles of public transit.

How long does it take to get an ADU permit in Roseville?

Using preapproved plans, the city aims to approve or deny applications within 30 days of a complete submission.

Can I use a preapproved ADU plan in Roseville?

Yes, the City of Roseville offers preapproved ADU plans to streamline the approval process.

Do I need separate utility meters for my ADU?

Yes, separate utility meters are often required for accurate billing and conservation efforts.