Estimated Timeline for ADU Permit Approval in California

 Table of Content
 1. What is an ADU?
2. Benefits of Building a Permitted ADU in California
 3. Estimated Timeline for ADU Permit Approval in California
 4.  Factors That Can Affect the ADU Approval Timeline
 5. FAQ
ADU

What is an ADU?

An Accessory Dwelling Unit (ADU) is a secondary, self-contained residential unit located on the same lot as a primary residence. These units can be attached, detached, or converted from existing structures like garages or basements. ADUs, often called secondary suitesgranny flats, backyard cottages, or in-law suites, offer a versatile solution for affordable housing, rental income, or multi-generational living.

Benefits of Building a Permitted ADU in California

Before diving into the timeline for ADU permit approval, it’s essential to understand why building a permitted ADU is a smart investment:

  • Increase Property Value: A well-constructed ADU can increase your property’s resale value by 20% to 30%.

  • Generate Rental Income: Rent out your ADU for additional income, especially in high-demand areas.

  • Legal Protection: Avoid costly fines or legal issues associated with unpermitted construction.

  • Financing Access: Lenders are more likely to approve loans or refinancing for properties with permitted ADUs.

  • Contribute to Housing Solutions: ADUs play a significant role in addressing California's housing shortage.

Estimated Timeline for ADU Permit Approval in California

Understanding the timeline for getting your ADU permit approved is essential for planning your project effectively. While each jurisdiction in California may have its unique processing times, here’s a general breakdown of what to expect when applying for an ADU permit:


1. Initial Research & Pre-Application (1-2 Weeks)

Before submitting your application, you'll need to research local ADU regulations and verify that your property meets the required zoning and size criteria. Many cities offer pre-application meetings where you can consult with planning officials to review your ADU concept and ensure it complies with local laws.

  • Average Time: 1 to 2 weeks

  • Key Actions: Verify zoning, review local ADU guidelines, and schedule a pre-application meeting (if needed).


2. Submit ADU Plans & Application (2-3 Weeks)

Once you've gathered the necessary information, you can begin preparing and submitting your ADU application. This typically involves submitting detailed construction plans, including site layout, elevation drawings, and any required documentation (like parking plans or environmental assessments). In California, Title 24 energy compliance and other state requirements must be met during this phase.

  • Average Time: 2 to 3 weeks for preparation

  • Key Actions: Submit application, plans, and documents to your local building department.


3. Local Jurisdiction Review (30-60 Days)

Once submitted, your application enters the review phase. Local planning and building departments will assess whether your project meets all zoning requirements, development standards, and local ordinances.

  • Key Considerations:

    • Zoning Review: Ensures your property is zoned for ADU development.

    • Design Review: Ensures the ADU adheres to aesthetic and architectural guidelines.

    • Code Compliance: Checks for compliance with California's Title 24 energy standards, fire safety codes, and utilities access.

If all requirements are met, many California cities have streamlined ADU approval processes that should allow for approval within 60 days. This timeline was set by recent California legislation (AB 68) to expedite the process.

  • Average Time: 30 to 60 days

  • Key Actions: Review and corrections (if needed), address any issues flagged during the review.


4. Approval & Permitting (1-2 Weeks)

After a successful review, your application moves to the approval phase. In many cases, this is a formality, especially with the by-right approval provisions in California state law. However, in cities with stricter rules or those requiring discretionary approvals, this phase may take longer.

Once approved, you will receive your building permit and can begin construction. Keep in mind that in some areas, you may be required to attend a public hearing before final approval is granted.

  • Average Time: 1 to 2 weeks for final approval

  • Key Actions: Receive permit, schedule inspections, and start construction.


Factors That Can Affect the ADU Approval Timeline

While the above timeline is a general guideline, several factors can affect how quickly your ADU permit is approved:

  • Local Department Workload: During peak times, local jurisdictions may experience delays due to high application volume.

  • Complexity of the Project: Larger or more complex ADUs may require additional reviews, which can extend the timeline.

  • Permit Exemptions & Variances: If your project doesn't conform to all zoning rules, you may need to apply for a variance, which can add time to the process.

  • Public Hearings: Some cities require public hearings, which can further delay approval.

  • Incomplete Applications: Submitting an incomplete application or inaccurate plans can lead to delays as additional information is requested.

FAQ

How long does it take to get an ADU permit approved in California?

The general timeline for ADU permit approval in California is between 60 to 90 days. However, it can vary depending on your local jurisdiction and the complexity of your project.

Can I start building my ADU before receiving approval?

No, you must receive formal approval and the necessary building permits before beginning construction.

Are there any expedited options for ADU permits?

Some cities offer expedited processing for ADUs, particularly if the plans meet all local zoning and building codes. Check with your local building department for more details.

What happens if my ADU permit is denied?

If your permit is denied, you have the option to appeal the decision or revise your plans to address the concerns raised by the planning department.

Can I apply for an ADU permit online in California?

Yes, many California cities allow homeowners to apply for ADU permits online, streamlining the process and reducing the time it takes to submit your application.